logo

NACE MR0175 Sour Service High Speed Centrifugal Pump CRA Clad API 610 OH6 45 M3/Hr

NACE MR0175 Sour Service High Speed Centrifugal Pump CRA Clad API 610 OH6 45 M3/Hr
NACE MR0175 Sour Service High Speed Centrifugal Pump CRA Clad API 610 OH6 45 M3/Hr
ブランド名
Sunstrand
製品型式
LMV-サワー-45
証明書
ISO 9001:2015, NACE MR0175/ISO 15156
原産国
中国四川省
MOQ
1セット
単価
USD 18,000 - 48,000 / Set
支払方法
T/T、L/C
供給能力
1ヶ月あたりの6セット
製品概要
NACE MR0175 Sour Service High Speed Centrifugal Pump CRA Clad API 610 OH6 45 M3/Hr NACE MR0175 Sour Service High Speed Centrifugal Pump Specifically engineered for upstream and downstream sour hydrocarbon services containing hydrogen sulfide, this high speed centrifugal pump meets stringent NACE ...
製品詳細
ハイライト:

NACE MR0175 Sour Service

,

CRA Clad API 610 Pump

,

High Speed Centrifugal Process

ポンプ型式: LMV-サワー-45
最大流量: 45 m3/時 (198 gpm)
最大ヘッド: 1,100m (3,610フィート)
モーター出力: 90kW (120HP)
材質グレード: AISI 316L と合金 625 オーバーレイ
H2S 分圧定格: 最大 1.5 bar (NACE レベル VII)
硬度制御: ≤ 22 HRC (肉盛溶接) / ≤ 34 HRC (ベース)
シール構成: ダブル加圧カートリッジ (API プラン 53B)

製品説明

NACE MR0175 Sour Service High Speed Centrifugal Pump CRA Clad API 610 OH6 45 M3/Hr
NACE MR0175 Sour Service High Speed Centrifugal Pump

Specifically engineered for upstream and downstream sour hydrocarbon services containing hydrogen sulfide, this high speed centrifugal pump meets stringent NACE MR0175/ISO 15156 material requirements for sulfide stress cracking resistance. Corrosion-resistant alloy (CRA) weld overlay on all wetted surfaces ensures long service life in aggressive sour environments.

Sour Service Specifications
Parameter Specification
Maximum Flow Rate 45 m³/hr (198 gpm)
Maximum Head 1,100 m (3,610 ft)
Motor Power 90 kW (120 HP)
H2S Partial Pressure Up to 1.5 bar (NACE Level VII)
Wetted Material 316L Base + Alloy 625 (UNS N06625) Weld Overlay
Max Hardness (Overlay) ≤ 22 HRC
Max Hardness (Base Metal) ≤ 34 HRC
Seal System API Plan 53B Double Pressurized Barrier Fluid
Bearing Housing Purge and Vent with Breather/Drain
Quality Assurance
  • Full Material Traceability: EN 10204 3.1 certification on all pressure-retaining and wetted components.
  • PMI Verification: Positive Material Identification performed on all CRA weld overlays and base materials.
  • Hardness Testing: 100% hardness traverse on all CRA cladding per NACE MR0175 Part 3.
  • NDT Package: Radiographic and liquid penetrant examination of all butt welds and overlay surfaces.
  • HIC/SSC Testing: Optional hydrogen-induced cracking and sulfide stress cracking coupons per NACE TM0284/TM0177.
Typical Applications

Sour crude transfer, produced water reinjection, amine regeneration feed, sour condensate pumping, and acid gas removal services in gas plants, refineries, and upstream production facilities operating with H2S-containing process fluids.

関連製品